  "id": "dex16",
  "ref": "DEx16",
  "name": "DEx16 Drumul Expres Arad – Oradea – A3 (Biharia)",
  "status": "partial_open",
  "status_label": "Parțial deschis",
  "status_detail": "Parțial deschis: 11,6 din 132,1 km",
  "open_km": 11.64,
  "total_km": 132.11,
  "sections": [
    {
      "id": "sec-dex16",
      "name": "Oradea – Biharia (A3)",
      "status": "open",
      "status_label": "Deschis",
      "status_detail": "Deschis: 11,6 km",
      "open_km": 11.64,
      "total_km": 11.64,
      "lots": [
        {
          "id": "lot-dex16",
          "lot_id": "lot-dex16",
          "name": "Conexiune Centura Oradea – Autostrada A3 (Biharia)",
          "lot_name": "Conexiune Centura Oradea – Autostrada A3 (Biharia)",
          "length_km": 11.64,
          "profile": "expressway",
          "status": "open",
          "status_label": "Deschis",
          "status_detail": "Deschis: 11,6 km",
          "contractor": "Strabag SRL",
          "contract_value": "545.9 mil. lei",
          "financing": "POIM",
          "progress_percent": 100,
          "contractual_date": "2024-04",
          "estimated_date": null,
          "actual_date": "2024-03-28",
          "attributed_range": null,
          "is_hand_drawn": false,
          "bbox": [
            21.844224,
            47.093924,
            21.8955,
            47.188504
          ]
        }
      ]
    },
    {
      "id": "sec-dex16-ar-or",
      "name": "Arad – Oradea",
      "status": "design",
      "status_label": "În proiectare",
      "status_detail": "În proiectare: 120,5 km",
      "open_km": 0,
      "total_km": 120.47,
      "lots": [
        {
          "id": "lot-dex16-ar-or-l1",
          "lot_id": "lot-dex16-ar-or-l1",
          "name": "Arad – Oradea Lot 1: Oradea – Salonta",
          "lot_name": "Arad – Oradea Lot 1: Oradea – Salonta",
          "length_km": 33.7,
          "profile": "expressway",
          "status": "design",
          "status_label": "În proiectare",
          "status_detail": "În proiectare: 33,7 km",
          "contractor": "Asocierea Precon Transilvania SRL – Automagistral Pivden SRL",
          "contract_value": "2.32 mld. lei fără TVA",
          "financing": "Programul Transport 2021–2027 (execuție); POIM 2014–2020 (proiectare)",
          "progress_percent": 0,
          "contractual_date": "2027-03-01",
          "estimated_date": "2029",
          "actual_date": null,
          "attributed_range": null,
          "is_hand_drawn": false,
          "bbox": [
            21.694064,
            46.793251,
            21.880757,
            47.07272
          ]
        },
        {
          "id": "lot-dex16-ar-or-l2",
          "lot_id": "lot-dex16-ar-or-l2",
          "name": "Arad – Oradea Lot 2: Salonta – Chișineu Criș",
          "lot_name": "Arad – Oradea Lot 2: Salonta – Chișineu Criș",
          "length_km": 39.7,
          "profile": "expressway",
          "status": "design",
          "status_label": "În proiectare",
          "status_detail": "În proiectare: 39,7 km",
          "contractor": "Asocierea Onur Taahhut (lider) – Straco Holding SRL",
          "contract_value": "2.77 mld. lei fără TVA",
          "financing": "Programul Transport 2021–2027 (execuție); POIM 2014–2020 (proiectare)",
          "progress_percent": 0,
          "contractual_date": "2027-04-01",
          "estimated_date": "2029",
          "actual_date": null,
          "attributed_range": null,
          "is_hand_drawn": false,
          "bbox": [
            21.480268,
            46.51959,
            21.693969,
            46.793319
          ]
        },
        {
          "id": "lot-dex16-ar-or-l3",
          "lot_id": "lot-dex16-ar-or-l3",
          "name": "Arad – Oradea Lot 3: Chișineu Criș – Arad",
          "lot_name": "Arad – Oradea Lot 3: Chișineu Criș – Arad",
          "length_km": 47.07,
          "profile": "expressway",
          "status": "design",
          "status_label": "În proiectare",
          "status_detail": "În proiectare: 47,1 km",
          "contractor": "Nurol Insaat ve Ticaret A.S.",
          "contract_value": "2.85 mld. lei fără TVA",
          "financing": "Programul Transport 2021–2027 (execuție); POIM 2014–2020 (proiectare)",
          "progress_percent": 0,
          "contractual_date": "2027-05-05",
          "estimated_date": "2029-05",
          "actual_date": null,
          "attributed_range": null,
          "is_hand_drawn": false,
          "bbox": [
            21.22348,
            46.197095,
            21.501039,
            46.519601
          ]
        }
      ]
    }
  ],
  "stories": [
    {
      "id": "sc-fa1dcc413106",
      "title": "VIDEO&FOTO Ucrainienii anunță în România: Între Budapesta și București, misiune îndeplinită! Automagistral-Pivden și-a…",
      "extracted_headline": "Automagistral-Pivden pregătește construcția primului tronson Arad–Oradea, start primăvara 2027",
      "summary": "Automagistral-Pivden anunță lansarea construcției primei secțiuni (33,7 km) a autostrăzii Arad–Oradea, cu începere programată primăvara anului 2027.",
      "url": "https://www.profit.ro/povesti-cu-profit/auto-transporturi/video-foto-ucrainienii-anunta-in-romania-intre-budapesta-si-bucuresti-misiune-indeplinita-automagistral-pivden-si-a-finalizat-cu-succes-activitatea-22961564",
      "published_at": "2026-11-07T15:34:00Z",
      "roads": [
        "DEx16"
      ],
      "lot_id": null,
      "lot_ids": [],
      "source": {
        "id": "profit",
        "name": "Profit.ro",
        "trust_tier": 2
      },
      "co_citations": []
    },
    {
      "id": "sc-13272b7b5a9f",
      "title": "Ucrainenii care intră anul viitor pe Drumul Expres Arad – Oradea: România traversează în prezent un adevărat avânt în…",
      "extracted_headline": "Contract semnat pentru Lotul 1 al Drumului Expres Arad–Oradea; lucrările programate din primăvara 2027",
      "summary": "Asocierea PRECON TRANSILVANIA – AUTOMAGISTRAL PIVDEN a câștigat și a semnat contractul pentru Lotul 1 (33,7 km) al Drumului Expres Arad–Oradea, proiect finanțat prin Programul Transport 2021–2027.",
      "url": "https://www.economica.net/drumul-expres-arad-oradea-2_992876.html",
      "published_at": "2026-11-07T15:07:14Z",
      "roads": [
        "DEx16"
      ],
      "lot_id": "lot-dex16-ar-or-l1",
      "lot_ids": [
        "lot-dex16-ar-or-l1"
      ],
      "source": {
        "id": "economica",
        "name": "Economica.net",
        "trust_tier": 2
      },
      "co_citations": []
    },
    {
      "id": "sc-133539ce947b",
      "title": "Încep lucrările la Drumul Expres Arad-Oradea",
      "extracted_headline": "Încep lucrările pregătitoare pentru Drumul Expres Arad–Oradea, lucrări estimate sfârșitul oct. 2026",
      "summary": "Lucrările pregătitoare pentru Drumul Expres Arad–Oradea sunt programate să înceapă la finalul lunii octombrie 2026, cu activități de delimitare a culoarului și cercetări arheologice.",
      "url": "https://economedia.ro/incep-lucrarile-la-drumul-expres-arad-oradea-asocierea-onur-straco-intra-pe-traseu-de-la-finalul-lunii-octombrie.html",
      "published_at": "2026-10-06T17:00:07Z",
      "roads": [
        "DEx16"
      ],
      "lot_id": "lot-dex16-ar-or-l1",
      "lot_ids": [
        "lot-dex16-ar-or-l1",
        "lot-dex16-ar-or-l3"
      ],
      "source": {
        "id": "economedia",
        "name": "Economedia",
        "trust_tier": 2
      },
      "co_citations": []
    },
    {
      "id": "sc-70e6955f11bf",
      "title": "Drumul Expres Arad - Oradea. Exproprierile de pe traseu se vor încheia cu proprietarii din Şimand şi Chişineu-Criş /…",
      "extracted_headline": "Exproprierile pentru Drumul Expres Arad–Oradea se apropie de final; contracte de execuție semnate pentru toate loturile",
      "summary": "DRDP Timişoara anunță că procedura de expropriere pentru Drumul Expres Arad–Oradea se va finaliza prin întâlniri la Şimand şi Chişineu‑Criş.",
      "url": "https://economedia.ro/drumul-expres-arad-oradea-exproprierile-de-pe-traseu-se-vor-incheia-cu-proprietarii-din-simand-si-chisineu-cris-cand-vor-incepe-lucrarile.html",
      "published_at": "2026-04-20T13:37:08Z",
      "roads": [
        "DEx16"
      ],
      "lot_id": "lot-dex16-ar-or-l1",
      "lot_ids": [
        "lot-dex16-ar-or-l1",
        "lot-dex16-ar-or-l2",
        "lot-dex16-ar-or-l3"
      ],
      "source": {
        "id": "economedia",
        "name": "Economedia",
        "trust_tier": 2
      },
      "co_citations": []
    },
    {
      "id": "sc-5467995db1cb",
      "title": "Drum expres de la Oradea la Arad: Contract semnat pentru ultimul lot care nu avea constructor / Care este termenul de…",
      "extracted_headline": "Contract semnat pentru Lotul 3 din Drumul Expres Oradea–Arad; termen de finalizare 24 luni",
      "summary": "Contractul pentru Lotul 3 (47,07 km) al drumului expres Oradea–Arad a fost semnat, astfel întreaga șosea de 120 km are constructor.",
      "url": "https://hotnews.ro/drum-expres-de-la-oradea-la-arad-contract-semnat-pentru-ultimul-lot-care-nu-avea-constructor-care-este-termenul-de-finalizare-harta-2160835",
      "published_at": "2026-01-29T12:29:12Z",
      "roads": [
        "DEx16"
      ],
      "lot_id": "lot-dex16-ar-or-l1",
      "lot_ids": [
        "lot-dex16-ar-or-l1",
        "lot-dex16-ar-or-l2",
        "lot-dex16-ar-or-l3"
      ],
      "source": {
        "id": "hotnews",
        "name": "HotNews",
        "trust_tier": 2
      },
      "co_citations": []
    },
    {
      "id": "sc-f8591eaefe7c",
      "title": "Drum Expres Arad - Oradea: Autorităţile încep exproprierile pe traseul din judeţul Arad",
      "extracted_headline": "Încep exproprierile pentru Lotul 3 din Drumul Expres Arad–Oradea în județul Arad",
      "summary": "Direcţia Regională de Drumuri şi Poduri Timişoara anunţă începerea comisiilor de verificare a dreptului de proprietate pentru imobilele care vor fi expropriate pe Lotul 3 (Chişineu Criş – Arad).",
      "url": "https://economedia.ro/drum-expres-arad-oradea-autoritatile-incep-exproprierile-pe-traseul-din-judetul-arad.html",
      "published_at": "2025-10-08T13:55:03Z",
      "roads": [
        "DEx16"
      ],
      "lot_id": "lot-dex16-ar-or-l3",
      "lot_ids": [
        "lot-dex16-ar-or-l1",
        "lot-dex16-ar-or-l2",
        "lot-dex16-ar-or-l3"
      ],
      "source": {
        "id": "economedia",
        "name": "Economedia",
        "trust_tier": 2
      },
      "co_citations": []
    },
    {
      "id": "sc-758a96020aa7",
      "title": "CNAIR a desemnat câștigătorul pentru construcția lotului 2 al DEx Arad-Oradea",
      "extracted_headline": "CNAIR a desemnat câștigătorul pentru construcția lotului 2 al DEx Arad‑Oradea",
      "summary": "CNAIR a anunțat că lotul 2 al Drumului Expres Arad‑Oradea a fost atribuit asociației ONUR TAAHHUT…‑STRACO HOLDING.",
      "url": "https://www.cnadnr.ro/ro/comunicare/comunicate-de-presa/interes-general/cnair-desemnat-c%C3%A2%C8%99tig%C4%83torul-pentru-construc%C8%9Bia-3",
      "published_at": "2025-08-04T12:00:00Z",
      "roads": [
        "DEx16"
      ],
      "lot_id": null,
      "lot_ids": [],
      "source": {
        "id": "cnair",
        "name": "CNAIR Comunicate de Presă",
        "trust_tier": 1
      },
      "co_citations": []
    },
    {
      "id": "sc-6e441b79bde2",
      "title": "Drumul Expres Arad-Oradea. CNAIR a semnat contractul pentru construcția primului lot cu o asociere de constructori…",
      "extracted_headline": "CNAIR a semnat contractul pentru Lotul 1 (Oradea–Salonta) din DEx16 cu asociere româno‑ucraineană",
      "summary": "CNAIR a semnat contractul pentru construcția primului lot (Oradea–Salonta) din Drumul Expres Arad–Oradea cu o asociere româno‑ucraineană.",
      "url": "https://economedia.ro/drumului-expres-arad-oradea-cnair-a-semnat-contractul-pentru-constructia-primului-lot-cu-o-asociere-de-constructori-romani-si-ucraineni.html",
      "published_at": "2025-05-15T12:33:02Z",
      "roads": [
        "DEx16"
      ],
      "lot_id": "lot-dex16-ar-or-l1",
      "lot_ids": [
        "lot-dex16-ar-or-l1",
        "lot-dex16-ar-or-l2",
        "lot-dex16-ar-or-l3"
      ],
      "source": {
        "id": "economedia",
        "name": "Economedia",
        "trust_tier": 2
      },
      "co_citations": []
    },
    {
      "id": "sc-cf6bdc1646fa",
      "title": "CNAIR a desemnat câstigătorul contractului pentru construcția lotului 3 al Drumului Expres Arad – Oradea!",
      "extracted_headline": "CNAIR a desemnat câștigătorul pentru lotul 3 al Drumului Expres Arad‑Oradea",
      "summary": "CNAIR a anunțat că lotul 3 al Drumului Expres Arad‑Oradea, de 47,07 km, a fost atribuit Asociației AUTOMAGISTRAL PIVDEN și PRECON TRANSILVANIA.",
      "url": "https://www.cnadnr.ro/ro/comunicare/comunicate-de-presa/interes-general/cnair-desemnat-c%C3%A2stig%C4%83torul-contractului-pentru-7",
      "published_at": "2024-12-16T12:00:00Z",
      "roads": [
        "DEx16"
      ],
      "lot_id": "lot-dex16-ar-or-l3",
      "lot_ids": [
        "lot-a1-sb-or-l3",
        "lot-dex16-ar-or-l3"
      ],
      "source": {
        "id": "cnair",
        "name": "CNAIR Comunicate de Presă",
        "trust_tier": 1
      },
      "co_citations": []
    },
    {
      "id": "sc-9ed73520feb2",
      "title": "Drum Expres Arad - Oradea. CNAIR a primit opt oferte pentru construcția Lotului 2 Salonta - Chișineu (40 km)",
      "extracted_headline": "CNAIR: opt oferte pentru Lotul 2 Salonta–Chișineu Criș din Drumul Expres Arad–Oradea",
      "summary": "CNAIR a primit opt oferte pentru Lotul 2 Salonta – Chișineu Criș (39,7 km) din Drumul Expres Arad – Oradea, în timp ce Lotul 1 a avut şapte oferte, iar Lotul 3 nouă.",
      "url": "https://economedia.ro/drum-expres-arad-oradea-cnair-a-primit-opt-oferte-pentru-constructia-lotului-2-salonta-chisineu-40-km.html",
      "published_at": "2024-07-29T20:43:45Z",
      "roads": [
        "DEx16"
      ],
      "lot_id": "lot-dex16-ar-or-l2",
      "lot_ids": [
        "lot-dex16-ar-or-l1",
        "lot-dex16-ar-or-l2",
        "lot-dex16-ar-or-l3"
      ],
      "source": {
        "id": "economedia",
        "name": "Economedia",
        "trust_tier": 2
      },
      "co_citations": []
    }
  ],
  "milestones": [
    {
      "lot_id": "lot-dex16",
      "lot_name": "Conexiune Centura Oradea – Autostrada A3 (Biharia)",
      "type": "open",
      "label": "Dat în trafic",
      "date": "2024-03-28",
      "source_label": "Oficial CNAIR",
      "quote": "Deschidere oficială pe Conexiune Centura Oradea – Autostrada A3 (Biharia) la data de 2024-03-28"
    },
    {
      "lot_id": "lot-dex16",
      "lot_name": "Conexiune Centura Oradea – Autostrada A3 (Biharia)",
      "type": "contractual",
      "label": "Termen contractual",
      "date": "2024-04",
      "source_label": "Contract semnat",
      "quote": "Termen contractual stabilit la semnarea contractului: 2024-04"
    },
    {
      "lot_id": "lot-dex16-ar-or-l1",
      "lot_name": "Arad – Oradea Lot 1: Oradea – Salonta",
      "type": "estimated",
      "label": "Deschidere estimată",
      "date": "2029",
      "source_label": "Grafic de execuție",
      "quote": "Deschidere estimată conform raportărilor: 2029"
    },
    {
      "lot_id": "lot-dex16-ar-or-l1",
      "lot_name": "Arad – Oradea Lot 1: Oradea – Salonta",
      "type": "contractual",
      "label": "Termen contractual",
      "date": "2027-03-01",
      "source_label": "Contract semnat",
      "quote": "Termen contractual stabilit la semnarea contractului: 2027-03-01"
    },
    {
      "lot_id": "lot-dex16-ar-or-l2",
      "lot_name": "Arad – Oradea Lot 2: Salonta – Chișineu Criș",
      "type": "estimated",
      "label": "Deschidere estimată",
      "date": "2029",
      "source_label": "Grafic de execuție",
      "quote": "Deschidere estimată conform raportărilor: 2029"
    },
    {
      "lot_id": "lot-dex16-ar-or-l2",
      "lot_name": "Arad – Oradea Lot 2: Salonta – Chișineu Criș",
      "type": "contractual",
      "label": "Termen contractual",
      "date": "2027-04-01",
      "source_label": "Contract semnat",
      "quote": "Termen contractual stabilit la semnarea contractului: 2027-04-01"
    },
    {
      "lot_id": "lot-dex16-ar-or-l3",
      "lot_name": "Arad – Oradea Lot 3: Chișineu Criș – Arad",
      "type": "estimated",
      "label": "Deschidere estimată",
      "date": "2029-05",
      "source_label": "Grafic de execuție",
      "quote": "Deschidere estimată conform raportărilor: 2029-05"
    },
    {
      "lot_id": "lot-dex16-ar-or-l3",
      "lot_name": "Arad – Oradea Lot 3: Chișineu Criș – Arad",
      "type": "contractual",
      "label": "Termen contractual",
      "date": "2027-05-05",
      "source_label": "Contract semnat",
      "quote": "Termen contractual stabilit la semnarea contractului: 2027-05-05"
    }
  ]
}