  "id": "lot-a7-bc-pas-l2",
  "lot_id": "lot-a7-bc-pas-l2",
  "name": "Lotul 2: Trifești – Gherăești (Mircești)",
  "lot_name": "Lotul 2: Trifești – Gherăești (Mircești)",
  "road_id": "a7",
  "road_ref": "A7",
  "road_name": "A7 Autostrada Moldovei",
  "section_id": "sec-a7-bc-pas",
  "section_name": "Bacău – Pașcani",
  "length_km": 19,
  "open_km": 0,
  "profile": "motorway",
  "contractor": "Asocierea SA&PE Construct – Spedition UMB – Tehnostrade",
  "contract_value": "1.278 mld. lei (fără TVA)",
  "financing": "PNRR",
  "tender_stage": "work_commenced",
  "progress_percent": 65,
  "contractual_date": "2026-10-10",
  "estimated_date": "2026-Q4",
  "actual_date": null,
  "status": "construction",
  "status_label": "În execuție",
  "status_detail": "În execuție: 19,0 km",
  "bbox": [
    26.835798,
    46.892563,
    26.878903,
    47.050075
  ],
  "claims": [
    {
      "id": "clm-7ac1732a3d12",
      "claim_type": "progress_percent",
      "date_type": null,
      "value": "65",
      "quote": "iar lotul 2 (Trifești – Gherăești), de 18,99 km, a ajuns la 65%.",
      "url": "https://www.profit.ro/povesti-cu-profit/auto-transporturi/video-umbrarescu-a-adus-1-000-de-muncitori-pe-autostrada-bacau-pascani-22978903",
      "source": "Profit.ro",
      "source_name": "Profit.ro",
      "tier": 2,
      "date": "2026-11-10",
      "approved_at": "2026-11-10T14:14:39.898Z"
    }
  ],
  "stories": [
    {
      "id": "sc-e9ca20843911",
      "title": "VIDEO | A7 Bacău – Pașcani: Podul de 520 de metri peste râul Moldova, de lângă Pildești, avansează. Lotul 2 a ajuns la…",
      "extracted_headline": "Umbrărescu a mobilizat muncitori la podul peste Moldova de pe A7, Lotul 2 Trifești–Gherăești",
      "summary": "Compania condusă de Umbrărescu a mobilizat muncitori la podul peste Moldova pe Autostrada A7, tronson Bacău–Pașcani, pe 22 noiembrie 2026.",
      "url": "https://economedia.ro/video-a7-bacau-pascani-podul-de-520-de-metri-peste-raul-moldova-de-langa-pildesti-avanseaza-lotul-2-a-ajuns-la-un-stadiu-fizic-de-63.html",
      "published_at": "2026-11-22T11:15:16Z",
      "roads": [
        "A7"
      ],
      "lot_id": "lot-a7-bc-pas-l2",
      "lot_ids": [
        "lot-a7-bc-pas-l2"
      ],
      "source": {
        "id": "economedia",
        "name": "Economedia",
        "trust_tier": 2
      },
      "co_citations": [
        {
          "id": "art-6da64844fa90",
          "source_name": "Profit.ro",
          "url": "https://www.profit.ro/povesti-cu-profit/auto-transporturi/video-umbrarescu-a-adus-muncitori-la-podul-peste-moldova-pe-autostrada-a7-bacau-pascani-23003825",
          "title": "VIDEO Umbrărescu a adus muncitori la podul peste Moldova, pe Autostrada A7 Bacău - Pașcani"
        }
      ]
    },
    {
      "id": "sc-d8c165f62874",
      "title": "Autostrada A7 Bacău – Pașcani: stadiul lucrărilor pe loturi",
      "extracted_headline": "Stadiul lucrărilor la autostrada A7 Bacău‑Pașcani: progres, termene și contracte pe cele trei loturi",
      "summary": "Lucrările la autostrada A7 Bacău‑Pașcani avansează, cu progres fizic între 55,70% și 71,70% pe cele trei loturi.",
      "url": "https://economedia.ro/autostrada-a7-bacau-pascani-stadiul-a-ajuns-la-717-pe-primul-lot-lotul-2-are-termenul-de-finalizare-depasit.html",
      "published_at": "2026-10-23T17:30:57Z",
      "roads": [
        "A7"
      ],
      "lot_id": "lot-a7-bc-pas-l2",
      "lot_ids": [
        "lot-a7-bc-pas-l1",
        "lot-a7-bc-pas-l2",
        "lot-a7-bc-pas-l3"
      ],
      "source": {
        "id": "economedia",
        "name": "Economedia",
        "trust_tier": 2
      },
      "co_citations": []
    }
  ],
  "provenance": {
    "progress_percent": {
      "source": "Profit.ro",
      "tier": 2,
      "url": "https://www.profit.ro/povesti-cu-profit/auto-transporturi/video-umbrarescu-a-adus-1-000-de-muncitori-pe-autostrada-bacau-pascani-22978903",
      "quote": "iar lotul 2 (Trifești – Gherăești), de 18,99 km, a ajuns la 65%.",
      "date": "2026-11-10"
    },
    "contractor": {
      "source": "Economedia",
      "tier": 2,
      "url": "https://economedia.ro/autostrada-a7-bacau-pascani-stadiul-a-ajuns-la-717-pe-primul-lot-lotul-2-are-termenul-de-finalizare-depasit.html",
      "quote": "sunt construite de asocierea Spedition UMB – SA&PE Construct – Tehnostrade",
      "date": "2026-10-23"
    },
    "contract_value": {
      "source": "Economedia",
      "tier": 2,
      "url": "https://economedia.ro/autostrada-a7-bacau-pascani-stadiul-a-ajuns-la-717-pe-primul-lot-lotul-2-are-termenul-de-finalizare-depasit.html",
      "quote": "Lotul 2 Trifești – Gherăești (Mircești) 18,99 km... 1,278 miliarde lei",
      "date": "2026-10-23"
    },
    "financing": {
      "source": "CNAIR (cnadnr.ro)",
      "tier": 1,
      "url": "https://www.cnadnr.ro/ro/proiecte/autostrada-bac%C4%83u-pa%C8%99cani",
      "quote": "valoarea fondurilor europene aferente PNRR este de 2,026,586,800,00 lei",
      "date": null
    },
    "contractual_date": {
      "source": "Economedia",
      "tier": 2,
      "url": "https://economedia.ro/autostrada-a7-bacau-pascani-stadiul-a-ajuns-la-717-pe-primul-lot-lotul-2-are-termenul-de-finalizare-depasit.html",
      "quote": "Data de finalizare înscrisă în datele CESTRIN este 10 octombrie 2026",
      "date": "2026-10-23"
    },
    "estimated_date": {
      "source": "Agerpres",
      "tier": 2,
      "url": "https://agerpres.ro/economic/2026/10/16/pistol-cnair-lotul-3-al-autostrazii-bacau---pascani-a7-a-depasit-stadiul-fizic-de-55--1603866",
      "quote": "Vreau ca până la finele acestui an să deschidem circulația pe încă aproximativ 49 de kilometri din A7",
      "date": "2026-10-16"
    },
    "status": {
      "source": "Economedia",
      "tier": 2,
      "url": "https://economedia.ro/autostrada-a7-bacau-pascani-stadiul-a-ajuns-la-717-pe-primul-lot-lotul-2-are-termenul-de-finalizare-depasit.html",
      "quote": "Pentru ambele, lucrările au început la 2 mai 2023.",
      "date": "2026-10-23"
    }
  },
  "attributed_range": null,
  "is_hand_drawn": false
}