  "id": "lot-a1-arad-nadlac-l2",
  "lot_id": "lot-a1-arad-nadlac-l2",
  "name": "Arad – Nădlac, Lot 2: Arad – Pecica",
  "lot_name": "Arad – Nădlac, Lot 2: Arad – Pecica",
  "road_id": "a1",
  "road_ref": "A1",
  "road_name": "A1 București – Pitești – Sibiu – Deva – Timișoara – Arad – Nădlac",
  "section_id": "sec-a1-lg-nadlac",
  "section_name": "Lugoj – Timișoara – Arad – Nădlac",
  "length_km": 16.66,
  "open_km": 16.66,
  "profile": "motorway",
  "contractor": "Asocierea Astaldi – Max Bögl",
  "contract_value": "89.35 mil. lei (fără TVA)",
  "financing": "Fondul de Coeziune (POS-T) / Buget de stat",
  "tender_stage": "work_commenced",
  "progress_percent": null,
  "contractual_date": "2015-06",
  "estimated_date": null,
  "actual_date": "2015",
  "status": "open",
  "status_label": "Deschis",
  "status_detail": "Deschis: 16,7 km",
  "bbox": [
    21.047016,
    46.174095,
    21.238395,
    46.208066
  ],
  "claims": [],
  "stories": [],
  "provenance": {
    "progress_percent": {
      "source": "Digi24",
      "tier": 2,
      "url": "https://www.digi24.ro/stiri/actualitate/social/soseaua-care-leaga-romania-de-occident-lotul-ii-al-autostrazii-nadlac-arad-inaugurat-410723",
      "quote": "în aceeași zi va fi deschis circulației lotul II al Autostrăzii Nădlac-Arad",
      "date": "2015-07-01"
    },
    "contractor": {
      "source": "HotNews",
      "tier": 2,
      "url": "https://hotnews.ro/?p=537402",
      "quote": "A1 Arad – Nadlac: Lot 2 – km 22+218 – 38+882 Lungime: 16,6 km Constructor: Astaldi – Max Boegl (initial Alpine) Cost: 90 mil lei pt finalizarea lucrarilor (in total 93 mil. euro)",
      "date": "2014-12-19"
    },
    "contract_value": {
      "source": "HotNews",
      "tier": 2,
      "url": "https://hotnews.ro/?p=537402",
      "quote": "A1 Arad – Nadlac: Lot 2 – km 22+218 – 38+882 Lungime: 16,6 km Constructor: Astaldi – Max Boegl (initial Alpine) Cost: 90 mil lei pt finalizarea lucrarilor (in total 93 mil. euro)",
      "date": "2014-12-19"
    },
    "financing": {
      "source": "HotNews",
      "tier": 2,
      "url": "https://hotnews.ro/?p=537402",
      "quote": "finantat din fonduri europene de coeziune POS-T si bugetul de stat",
      "date": "2014-12-19"
    },
    "contractual_date": {
      "source": "HotNews",
      "tier": 2,
      "url": "https://hotnews.ro/?p=537402",
      "quote": "data contractuala pentru finalizarea celorlalti 10,6 km din Lotul 2 este iunie 2015.",
      "date": "2014-12-19"
    },
    "actual_date": {
      "source": "Digi24",
      "tier": 2,
      "url": "https://www.digi24.ro/stiri/actualitate/social/soseaua-care-leaga-romania-de-occident-lotul-ii-al-autostrazii-nadlac-arad-inaugurat-410723",
      "quote": "în aceeași zi va fi deschis circulației lotul II al Autostrăzii Nădlac-Arad",
      "date": "2015-07-01"
    },
    "status": {
      "source": "Digi24",
      "tier": 2,
      "url": "https://www.digi24.ro/stiri/actualitate/social/soseaua-care-leaga-romania-de-occident-lotul-ii-al-autostrazii-nadlac-arad-inaugurat-410723",
      "quote": "șase kilometri au fost deschiși circulației în luna decembrie 2014, odată cu primul lot",
      "date": "2015-07-01"
    }
  },
  "attributed_range": null,
  "is_hand_drawn": false
}